Before We Start: Uneven Concrete and Standing Water
The starting point is a tired concrete patio that has gone uneven. It was laid on too little sharp sand, so the slabs have sunk out of level. With no drainage, surface water collects in pools after rain.
The brief is a space to entertain, with an aluminium pergola to follow later. So we are setting the size of the patio to fit the pergola. The old concrete will be broken out and replaced with grey porcelain paving: Rock Grey porcelain tiles from Country Supplies. The step up to the lawn will be topped in matching porcelain. An ACO drainage channel goes in front of the step to carry surface water away.
Before any paving is laid, the manhole cover and services need recessing. That lets the porcelain run flush over them. The job should take 13 working days.













